This loading dock membrane re & re project could not have gone better. For many of our clients down time is not an option, and Gator’s ability to be flexible is key to the success of such projects. In order to keep the loading dock fully operational during the repairs and surface preparation, all preparation work was completed between 6:00 pm and 6:00 am. When it came time for the coating installation, the entire coating was done with seamless installation over 2 days to meet the aesthetic criteria of the client. 20,000 square feet of installation in 2 days! We were also able to partner with our supplier to provide an extended warranty for our client.