Stantec Centre in Calgary required rehabilitation of their heated underground parking ramp. To repair the ramp Gator removed and disposed of the existing electrical heat trace lines, demolished the existing concrete (including excavation), and prepared adjacent areas for new concrete topping. The rehab consisted of new structural reinforced slab using high strength concrete and installation of new control joint. Topping slab included installation of new electrical heating system, wire mesh, and high strength concrete with tooled control joints.